Acceptance Criteria for an Outsourced Website Brief

How to turn a website brief into testable outcomes for design, content, and engineering.

RESEARCH / QUALITYA practical visual map for the work, checks, and handoff.
On this page
  1. Write criteria that can be checked
  2. Methodology
  3. Key Stats
  4. Key Takeaways
  5. Sources
  6. Further reading
  7. Related Research
  8. Frequently asked questions
  9. Who writes acceptance criteria?
  10. Can criteria change after work starts?
  11. Ready to plan your next step?

A brief is more useful when it describes how approval will be decided. Acceptance criteria connect audience needs to observable behavior across design, content, accessibility, performance, and handoff.

Write criteria that can be checked

State the route or component, user action, expected result, environment, evidence, and owner. Avoid words such as polished or intuitive unless they are paired with a concrete review method.

Methodology

This synthesis draws on web standards, service design, and software verification guidance. Criteria still need to be adapted to the site's audience and risk.

Key Stats

  • WCAG 2.2 defines testable success criteria for web accessibility (W3C)
  • OWASP ASVS publishes verification requirements for web applications (OWASP)

Key Takeaways

  • Put acceptance into the brief before production.
  • Make evidence and environment explicit.
  • Separate must-pass conditions from preferences.

Sources

  1. WCAG 2.2 Accessibility criteria.
  2. OWASP ASVS Security verification.
  3. W3C evaluation Testing methods.
  4. GOV.UK service manual Service guidance.
  5. Nielsen heuristics Usability review.
  6. web.dev performance Performance guidance.
  7. Google SEO starter guide Search basics.
  8. HTML standard Platform behavior.
  9. NIST SSDF Development practices.
  10. GitHub pull requests Review workflow.

Further reading

Outsourced design review rubric

Website QA evidence pack

Related reading

Related reading

Related reading

Frequently asked questions

Who writes acceptance criteria?

The accountable owner should approve them, with input from design, content, engineering, and QA.

Can criteria change after work starts?

Yes, but record the change, reason, impact, and new approval owner.

Ready to plan your next step?

Contact WebsiteDesignOutsource.com

Turn the guidance into a reviewable handoff

Record the owner, input, acceptance condition, evidence, and escalation point before production begins. That small contract makes the work easier to inspect and approve.

Plan a website production handoff

Move one website project from backlog to a reviewed handoff.

Share the pages, platform, current assets, deadline, and approval owner. We will help determine the right production lane and the decisions your team should keep.

Plan the handoff